The Southern Virginia Regional Alliance (SVRA) is pleased to join localities of Halifax, Patrick and Pittsylvania Counties and the City of Danville in announcing twenty-one sites that will move from Tier-Two to Tier-Four sites (signifying shovel-ready sites) in the Virginia Business Ready Sites Program (VBRSP) and eight sites that will move from Tier-Two to Tier-Five (shovel ready sites with graded pad sites). SVRA received $1,534,900 from GO Virginia Region 3 and $454,100 from the Virginia Tobacco Region Revitalization Commission (TRRC) to further the preparation of sites in areas identified with specific assets for transportation such as rail and highway access, utilities inclusive of significant supply of natural gas, electricity and water supply along with a demonstrated available labor shed and workforce pipeline. Southern Virginia leads the Commonwealth in the number of prepared sites, one of the reasons for the success they are achieving in business attraction. The strategy by local elected officials, government and economic development staff to keep an inventory of ready sites that serve diverse industries, leads to sites that are ready to market for prospects who need to ensure that the risks of building on the sites have been assessed and minimized.
The SVRA service region has worked with the engineering firms of Dewberry and Reynolds and Clark to complete right-of-way; engineering and building for reliable, redundant and abundant sites across the region. The strategy for site development included meeting diverse needs and has resulted in six VBRSP Tier-4 industrial parks in the region that provide access to eight VBRSP Tier-5 graded sites that are ready for immediate construction. An additional 21 VBRSP Tier-4 sites have completed the engineering due-diligence and are ready for grading and building within 12-18 months.
Sites range in size from 3.4 to 67 acres with from 2.5-32 acres of developable pad sites that can readily accommodate buildings from 20,000 sq. ft. to 600,000 square feet in size. Some of the lots can be joined to accommodate larger pad sites for expansion capacity with up to double lot.
Industrial Park / Site Current Sites |
VBRSP Ranking |
Developable Pad on Site |
Potential Building Size |
|
|
|
|
Airside Lot 2J (Airside Industrial Park – Danville) |
Tier 5 |
17-acre pad on 50.44-acre site |
300,000 sq. ft. |
Recent Park Wins – Essel Propak Expansions, Lite House Expansions, Butonni (Nestle), & 2 pending announcements |
|||
|
|
|
|
Cane Creek Centre – Danville/Pittsylvania RIFA |
Tier 4 |
|
|
Recent Park Wins – Walraven, Morgan Olson, Aerofarms, Tyson |
|||
Cane Creek Lot 1B – Rail |
Tier 4 |
27-acre pad on 49.12-acre site |
370,000 sq. ft. |
Cane Creek Lot 6B |
Tier 4 |
21-acre pad on 24.78-acre site |
380,000 sq. ft. |
Cane Creek Lot 6C |
Tier 4 |
23-acre pad on 30.71-acre site |
310,000 sq. ft. |
Cane Creek Lot 8A |
Tier 5 |
8.5-acre pad on 22.7-acre site |
100,000 sq. ft. |
Cane Creek Lot 10 – Rail |
Tier 4 |
32-acre pad on 67-acre site |
450,000 sq. ft. |
Cane Creek Lot 11A – Rail |
Tier 4 |
14-acre pad on 20.6-acre site |
150,000 sq. ft. |
Cane Creek Lot 11B – Rail |
Tier 4 |
13-acre pad on 16.6-acre site |
150,000 sq. ft. |
Cane Creek Lot 12 A |
Tier 4 |
4.5-acre pad on 5.2-acre site |
54,000 sq. ft. |
Cane Creek Lot 12 B |
Tier 4 |
7-acre pad on 8.6-acre site |
72,000 sq. ft. |
|
|
|
|
Coleman Site – Rail – largest rail served site in state |
Tier 4 |
|
|
Coleman Site Lot 1 |
Tier 4 |
13-acre pad on 30-acre site |
125,000 sq. ft. |
Coleman Site Lot 2 – Rail |
Tier 4 |
44-acre pad on 50-acre site |
700,000 sq. ft. |
Coleman Site Lot 3 – Rail |
Tier 4 |
25-acre pad on 78-acre site |
500,000 sq. ft. |
|
|
|
|
Cyber Park |
Tier 4 |
|
|
Recent Park Wins – Institute for Advanced Learning and Research (3), EIT/Zollner, Kyocera, Overfinch, BGF, FasTech, MEP |
|||
Cyber Park Lot 5 |
Tier 4 |
13-acre pad on 39.42-acre site |
200,000 sq. ft. |
Cyber Park Lot 7D |
Tier 5 |
20.5-acre pad on 62.86-acre site |
250,000 sq. ft. |
Cyber Park Lot 10C |
Tier 4 |
10-acre pad on 27.96-acre site |
100,000 sq. ft. |
Cyber Park Lot 12 B |
Tier 4 |
8-acre pad on 19.3-acre site |
100,000 sq. ft. |
|
|
|
|
Day Site – Halifax County |
Tier 4 |
|
|
Day Site Lot |
Tier 4 |
30-acre pad on 34 -acre site |
50,000 sq. ft. |
|
|
|
|
Rich Creek Corporate Park – Patrick County |
Tier 5 |
|
|
Recent Park Wins – Ten Oaks Expansion |
|||
Rich Creek Pad Site |
Tier 5 |
25-acre pad on70 -acre site |
100,000 sq. ft. |
Rich Creek site with Shell Building |
Tier 5 |
10-acre pad on 14-acre site |
20,000 sq. ft. |
|
|
|
|
Ringgold East Industrial Park |
|
|
|
Recent Park Wins – Axxor Expansion, Panaceutics |
|||
Ringgold East Site – Pittsylvania County – Rail |
Tier 5 |
28.3-acre pad on 51.04-acre site |
600,000 sq. ft. |
|
|
|
|
Riverview Industrial Park |
|
|
|
Recent Park Wins – JTI Expansion |
|||
Riverview Lot 5B – Riverview Industrial Park Danville |
Tier 4 |
6-acre pad on 11-acre site |
72,000 sq. ft. |
|
|
|
|
Southern Virginia Technology Park |
Tier 4 |
|
|
Recent Park Wins – IperionX |
|||
SVTP Lot A |
Tier 4 |
3-acre pad on 3.4-acre site |
31,250 sq. ft. |
SVTP Lot B |
Tier 5 |
11-acre pad on 14.7-acre site |
122,500 sq. ft. |
SVTP Lot C |
Tier 4 |
9-acre pad on 17-acre site |
97,500 sq. ft. |
SVTP Lot D |
Tier 4 |
6.5-acre pad on 29.4-acre site |
31,250 sq. ft. |
SVTP Lot E |
Tier 5 |
4.5-acre pad on 6.7-acre site |
48,000 sq. ft. |
SVTP Lot F |
Tier 5 |
9.5-acre pad on 12.6-acre site |
106,500 sq. ft. |
SVTP Lot G |
Tier 4 |
2.5-acre pad on 7.6-acre site |
20,000 sq. ft. |